Project planning

Coconut Milk Line Utilities | Water, Heat, Cooling & CIP

Identify the available site services before fixing the connected equipment and installation scope.

Separate product water from service water

Water used in extraction and formulation becomes part of the product mass balance. Washing, cleaning and cooling are different duties. State water quality, supply conditions and drain routing for each proposed interface.

Match utilities to the chosen thermal route

Request model-specific heating, cooling and other service requirements for the intended operating envelope. A chilled, retort or UHT aseptic route cannot be assigned one common utility figure from a generic line description.

Include cleaning and physical access

Provide layout constraints, drainage information, maintenance access and the existing cleaning arrangement. Review which equipment needs dismantling and which circuits can be included in a defined CIP programme.

Connected equipment

The duties to review

From scope to specification

Discuss your utilities & site connections requirements

Send the material you receive, the product you want and the packaging boundary. Add measurements where available.

Discuss your project →
Discuss your project